Fluke 3563 Guía De Funcionamiento Básico página 25

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Getting started with Analysis Vibration Sensor System
Check gateway and sensor connection
1. From the Instructions screen that appears, tap Continue to check whether the
sensors are connected to the gateway.
The Check Sensor Connection screen allows these actions:
 On-screen hints show if connectivity between the gateway and any sensor
fails. If necessary, reposition the gateway.
 An additional commissioned gateway may be selected for installation by
tapping Add Gateways. Follow the temporary gateway installation process.
 In case of unresolved connection issues, use the link to contact the FRS
support team.
 The sensor connection check is not finalized until all connection failures are
resolved. Sensors that fail to connect to the gateway must be removed from
the process. Tap Remove to take off sensor.
Mount sensors permanently then finish Fluke Connect mobile app process
1. Once connectivity with all sensors to be installed has been achieved, tap
Continue then mount the sensors permanently at the selected asset test points as
described in Mounting the sensor on page 28.
2. After mounting the sensors permanently, return to Fluke Connect App to finalize
the permanent installation process.
22

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

3503

Tabla de contenido