Descargar Imprimir esta página

GYS POT COMBI ARCPULL Manual De Instrucciones página 35

Ocultar thumbs Ver también para POT COMBI ARCPULL:

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 65
Operating manual
• At 0 (default value), the product ensures optimal bonding of the electrode to the support material
6 — Height:
• Height of lift (in millimetres) of the insert during the welding process.
• Too much height will increase arc blowback. Too little height increases the risk of the
weld to short circuiting, because the stud-end is deformed during welding process.
7— Force :
• Adjustable from 0 to 4. Applies to the force with which the insert is pushed into the weld pool
(forging).
• At 0 the immersion force is zero, at 4 it is maximum. If the weld does not comply with the ratio between the diameter
and the maximum thickness of the sheet. It may be necessary to reduce this force to avoid
piercing through.
Pressing the Menu/Enter button
Press the return button
CONFIGURATION
Configuration
> Pregas
Postgas
Language
Counts
Product reset
Info
Range of settings
Pregas
NoGas then 0.2 to 3
seconds
Post-gas
NoGas or 0.2 to 3 seconds
Language
FR, GB, DE, NL, ES, IT, RU
Push the return button
COUNTERS
When "Counters" is selected, the display shows:
- the log counter: number of welds made correctly since the product was put into operation. This counter is reset to
zero when the product is restarted.
- the total counter: number of welds made correctly by the unit since it left the factory.
- The activation/deactivation of the warning message regarding checking the ground rods.
Press G+ and G- to switch ON or OFF.
Original manual
will confirm the weld settings and return the unit to the manual weld screen.
to ignore the settings and return to the Main Menu.
Press the G+ and G- keys to move the cursor
on the left (Pre-gas, Post-gas, Language Reset
> 0.4s
machine, Information).
0.4s
EN
When the pre-gas, post-gas or language items
are highlighted, press the D+ and D- keys to
change their respective values.
Comment
To weld with gas shielding, it is recommended to have a pre-gas of at
least 0.4 seconds.
When welding is done with gas shielding, it is recommended to have a
post-gas of at least 0.4 seconds.
to return to the Main Menu.
Daily Count
Total Count
Rods check
Counts
xxxx
xxxxxxx
> ON
GYSPOT COMBI ARCPULL
35

Publicidad

loading