Descargar Imprimir esta página

Graf oneAdvanced Manual De Instalación página 3

Ocultar thumbs Ver también para oneAdvanced:

Publicidad

Idiomas disponibles

Idiomas disponibles

Contents
1
Please note: ......................................................................................................................................... 5
1.1 Safety
1.2 Assembly tool
1.3 Selecting the location
1.4 Aeration and ventilation
2
Final assembly and installation of oneAdvanced 3–9 PE ............................................................... 7
2.1 Dimensions
2.2 Scope of supply
2.3 Installation and operating principle
2.4 Fitting the installation kit
3
Final assembly and installation of oneAdvanced 10–14 PE ......................................................... 14
3.1 Dimensions
3.2 Scope of supply
3.3 Preparing the Carat S tank
3.3.1 Assembling the emergency overflow ........................................................................................................ 16
3.3.2 Drilled holes for Carat S tank inlet and outlet ........................................................................................... 17
3.3.3 Position of the outlet pipe ........................................................................................................................ 17
3.4 Fitting the installation kit
3.4.1 Final assembly of the ventilation system .................................................................................................. 18
3.4.2 Assembling the drain baffle ...................................................................................................................... 18
3.4.3 Mounting the aeration equipment on the installation kit. ....................................................................... 18
3.4.4 Inserting the installation kit into the tank ................................................................................................ 20
4
Final assembly and installation of oneAdvanced 16–90 PE ......................................................... 21
4.1 Installation and operating principle
4.2 Holes and tank connections on the Carat S tank
4.2.1 Holes for the upper tank connections ...................................................................................................... 23
4.2.2 Lower tank connections (only for 4-tank systems) ................................................................................... 24
4.2.3 Tank connection for excess sludge return ................................................................................................ 25
4.2.4 Note for four-tank systems ....................................................................................................................... 25
4.3 Installation of the setting-up kit
4.3.1 Assembly of the disc aerators (16–44 PE) ................................................................................................. 26
4.3.2 Assembly of the pipe aerators (50–90 PE) ................................................................................................ 26
4.3.3 Inserting the aerators into the tank/tanks ................................................................................................ 27
4.3.4 Installation of the crossbar ....................................................................................................................... 28
4.3.5 Outlet pipe ................................................................................................................................................ 28
4.3.6 Holding plate for SBR reactor with 2-tank systems .................................................................................. 29
4.3.7 Holding plate for SBR reactor with 4-tank systems .................................................................................. 30
4.3.8 Connecting the holding plate and lifters in the SBR tank ......................................................................... 31
4.3.9 Air cabinet connection .............................................................................................................................. 32
4.3.10 Installing the holding plate in the SBR tank .............................................................................................. 33
4.3.11 Inserting the holding plate ........................................................................................................................ 33
4.3.12 Connecting the clear water extraction ..................................................................................................... 33
4.3.13 Connecting the excess sludge lifter .......................................................................................................... 34
4.3.14 Installing the feed lifter in the preliminary cleaning system..................................................................... 34
5
Assembling the switch cabinet for indoor installation.................................................................. 35
5.1 Selecting the location
5.2 PP switch cabinet for indoor installation
5.2.1 Technical data ........................................................................................................................................... 35
5.2.2 Installation ................................................................................................................................................ 36
5.2.3 Connecting the air hoses........................................................................................................................... 36
5.2.4 Mounting the GRAF empty pipe seal of PE foam ...................................................................................... 37
5.2.5 Empty pipe seal with PU foam .................................................................................................................. 38
5.2.6 Electrical connection ................................................................................................................................. 38
Contents
3 / 144
5
5
5
5
7
8
9
10
14
15
16
18
21
23
26
35
35

Publicidad

loading