Descargar Imprimir esta página

Graf oneAdvanced Manual De Instalación página 30

Ocultar thumbs Ver también para oneAdvanced:

Publicidad

Idiomas disponibles

Idiomas disponibles

4 Final assembly and installation of oneAdvanced 16–90 PE
Holding plate
In 2-tank systems a holding plate is installed in the SBR reactor for securing the lifters. The installation of
the holding plate is described in the following sections.
4.3.7
Holding plate for SBR reactor with 4-tank systems
Clips are not used.
Holding plate
Holding plate
30 / 144

Publicidad

loading