Descargar Imprimir esta página

Graf oneAdvanced Manual De Instalación página 29

Ocultar thumbs Ver también para oneAdvanced:

Publicidad

Idiomas disponibles

Idiomas disponibles

4 Final assembly and installation of oneAdvanced 16–90 PE
4.3.5.1
Outlet pipe without sampler
Pipe diameter
<= 50 PE: DN 110
The outlet pipe is pushed with the pointed end
foremost through the outlet seal from the inside to
the outside. A 90° elbow is attached to the outlet
pipe.
4.3.5.2
Outlet pipe with sampler
An 8 mm hole is required in the sampler in order to fasten the internal sampler.
The sampler is then positioned in the middle of the tank in the outlet direction, as shown in the image
above, and fixed to the crossbar using nuts and screws. The connection between the sampler and socket
of the outlet pipe is fixed using Spax screws.
4.3.6
Holding plate for SBR reactor with 2-tank systems
M8x30 bolt
1000
The 90° elbow is secured in place through an
8.5 mm hole drilled through it. The 90° elbow is
then bolted firmly to the crossbar through this
hole.
Tank size
2.700L
3.750L
4.800L
6.500L
Screw
M8x35
29 / 144
H
170 mm
170 mm
130 mm
110 mm
8.5 mm
hole

Publicidad

loading