6 Assembling the exterior switch cabinet (optional)
Before installation a strip or solid foun-
dation must be prepared.
250 mm
When the foundation is being cast,
the drawn dimensions must be ad-
hered to, particularly the position of
the hole through which the hoses
will be led later.
There are four M10 holes in the
cabinet base. These holes must be
M10 holes
continued in the concrete founda-
tion below.
Insert the M10 dowels into the
holes. Securing the switch cabinet
with the aid of the four M8 bolts (to-
gether with washers).
45 / 144