Descargar Imprimir esta página

Graf oneAdvanced Manual De Instalación página 33

Ocultar thumbs Ver también para oneAdvanced:

Publicidad

Idiomas disponibles

Idiomas disponibles

4 Final assembly and installation of oneAdvanced 16–90 PE
4.3.10 Installing the holding plate in the SBR tank
4.3.11 Inserting the holding plate
The ventilation, including the concrete weight, is inserted into the tank. The complete holding plate as-
sembly is pushed onto the ventilation downpipe and fitted onto the crossbar. The holding plate is fitted on
the inflow side.
The stainless steel hose connector with thread is then screwed on to the ventilation downpipe – make
sure you use a Teflon seal.
The downpipe is
pushed through; do
not tighten the
screws on the clip.
4.3.12 Connecting the clear water extraction
The outlet of the clear water lifter is routed into the 90° bend or into the internal sampler.
Connecting clear water lifting without sampler
Connecting clear water lifting with sampler
33 / 144
Tighten the screws
on the upper pipe
clip

Publicidad

loading