Figure 10
Type C43
Gas appliance with combustion air inlet and exhaust system to
be connected to an exhaust system.
Figure 11
Type C53
Gas appliance with separate combustion air inlet and exhaust
system. The inlets are located in different pressure ranges.
Figure 12
Note
The chimney draught specifications given in the technical data
must be maintained if you want to achieve the prescribed com-
bustion values.
Drainage of condensate
The condensate pipes must be siphoned directly at the conden-
sate connection. The siphon height must be 30 cm. The siphon
is not included. The condensate pipe must not be firmly connect-
ed to the drainage system. The condensate must first flow out
freely into a funnel or a neutralisation container.
Wall mount
– Before installing, please check the load-bearing capacity of
the wall. The fastening material delivered with the plant is
suitable for concrete walls. Use suitable anchor plugs and
screws for hollow component walls, brick walls and gas con-
crete walls - for e.g. injection anchor (for drilling diagram see
the specifications sheet).
– Figure 17 - items 19 and 25
The appliance should not be directly attached to the network
of water and high pressure pipes. It is mandatory to install the
connecting hoses.
– Figure 17 - A
A shut-off tap must be installed between the main water sup-
ply and the connecting hose.
Installing the high pressure connections
For installation, please follow the specifications of the VDMA
sheet 24416 "High pressure cleaners; fixed high pressure clean-
ing systems; concepts, requirements, installation, testing" (the
German version can be procured from Beuth Verlag, Cologne,
www.beuth.de).
– The pressure loss in the pipe connections must lie below 1.5
MPa.
– The completed pipe connections must be checked using 32
MPa.
37
English