Descargar Imprimir esta página

Key Automation TELESCOPIC LEVANTE Serie Instrucciones Y Advertencias Para Su Instalación Y Uso página 59

Actuador para puertas automáticas de corredera

Publicidad

Idiomas disponibles

Idiomas disponibles

8.3 - Connection of the panel to the transmission belt
Install the belt by inserting it between the motor pulley and the
guide pulley. The two ends of the belt that will need to be joined
together must be on the lower branch.
To make the joint between the two ends, use the appropriate
brackets and proceed as shown in the figure below.
Once the two ends are joined, connect the junction plate to the
panel runner in the position indicated in the "Installation Dimensions
- top and front views" section according to the type of door being
installed.
N.B.: In the case of a double opening door (2 + 2), before
connecting the second panel to the belt it is necessary to
tighten the belt (see section "belt tensioning").
8.4 - Tensioning the belt
To tension the belt, first proceed by loosening the two screws
"A" and then apply the tension by tightening the screw "B" until
reaching the pre-set control dimension indicated in the table below,
Ltr
beam
tension control
length (m)
measurement (mm)
up to 2.9 m
from 2.9 m up to 6 m
over 6 m
B
A
Lc
Lm
corresponding spring
length (mm)
30mm
25.5mm
29mm
24.5mm
28mm
23.5mm
MOTOR
POWER SUPPLY
ENCODER
24 V
The encoder cable connects to terminal CN4, as shown in the
figure, with the sequence:
BLACK cable (-)
WHITE cable (A)
GREEN cable (B)
RED cable (+)
ATTENTION !
In the case of a 1 + 1 panel with opening to the left, the belt
connection bracket must be placed over the connection bracket
between the slow and fast panel
according to the length of the beam, then retighten the two screws
"A".
A
Lc
EN
59

Publicidad

loading