SPO16 - SPO20 2-Post DC Installation
Battery Type
Voltage
Size
Cold Cranking Amps
Terminal Location
Note: If a single battery fails during use the system should be evaluated to determine if the
second battery should be replaced at the same time to avoid down time at a later date due to
issues with the battery.
25. Power Unit:
A) First, install (1) star washer onto one of the (4) 5/16"-
18NC x 1" long HHCS. This is very important for ground-
ing.
Recommended Battery Specifications
Normal Operation and Life High Use (15 minutes or less between lift
Standard Lead Acid
12V
Group 24
525
Top
Fig. 28
PUSH NUTS HOLD BOLTS
AND SPLASH SHIELD TO BRACKET
ON ONE BOLT,
PLACE (2) 5/16" STAR WASHERS
5/16"-18NC x 1" LONG BOLT
20
cyles) or increase in life under normal use
Absorbed Glass Mat (AGM) Technology
12V
Group 24
710
Top
B) Put the (4) 5/16"-18NC x 1" HHCS thru holes in the
power unit bracket and splash shield using push-nuts to
hold in place, Fig. 28.
C) Mount power unit with motor up to the column bracket
and install (2) 5/16" star washers and (4) 5/16" nuts.
26. DC Control Cabinet:
A) First, remove front plastic covers and lower cover, Fig.
29, and set aside to be reinstalled later.
Fig. 29
REMOVE FRONT COVER
AND THIS LOWER COVER