B) Install included 3/8 NPT strain relief and nut to the
back of the cabinet and route the FA9190-6 over head
switch cable through the strain relief, Figure 30. The
FA9190-6 overhead switch cable is shipped attached
to the grounding bolt inside the DC control cabinet.
C) Attach battery cabinet mounting bracket to the cabinet
with (2) 5/16"-18NC x 1" lg. flange head cap screws and
nuts as shown, Figure 30a.
Fig. 30a
(2) 5/16"-18NC HEX FLGD
WZLOCK NUT
Fig. 30
INSTALL 3/8 NPT STRAIN
RELIEF AND ROUTE FA9190-6
OVERHEAD SWITCH CABLE
THROUGH THE STRAIN
RELIEF (ATTACHED TO THE
MOTOR CONTACTOR)
BATTERY CABINET
MOUNTING BRACKET
(2) 5/16"-18NC x 1" Lg. HEX FLGD
WZLOCK HHCS
21