The basic balancing machine packaging consists of 1 wood package containing:
- the balancing machine (M, fig.4);
- the set of accessories;
- the monitor in its packaging;
- Before installation, the balancing machine must be transported in its original
packaging, keeping it in the position marked on the packaging. It can be
transported by placing the box on a wheeled trolley or by inserting the forks of a
fork-lift truck into the openings in the pallet (fig.1).
- Packing dimensions.
Length
(mm)
1440
- Ambient conditions in place of storage:
• relative humidity from 20% to 95%;
• temperature from -10° to +60°C.
ATTENTION
Do not place other items on top of the two packs, as this may result in damage.
After installation, the machine can be moved using the following methods:
- with a crane, using special equipment that holds the machine at the lifting points
(fig.2); passing the supporting sling underneath the beam which supports the central
unit (right-hand side of the body).
- inserting the forks of the lift truck under the machine so that the centre of the
forks correspond approximately to the centre line of the cabinet (fig.3).
During these operations, make sure that the fork-lift truck is fixed to the body of
the balancing machine by means of the safety screw provided (A, fig.8).
WARNING
Always unplug the power supply lead from the socket before moving the
machine.
ATTENTION
Never apply force to the spin shaft when moving the machine.
60
TRANSPORT, STORAGE
AND HANDLING
Depth
(mm)
1330
Height
Weight Packing weight
(mm)
(kg)
1250
319
ET 88 operator's manual
(kg)
85