Assembly; Assembling The Cl03/Cl03-Xl With Profinet - Aventics PROFINET VS series Instrucciones De Servicio

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 169
PROFINET address
Diagnosis
Number of valves
controlled
AVENTICS | PROFINET | R412023897–BDL–001–AA
The PROFINET address (PROFINET name) can only be set via
software tools.
The supply voltages for the electronics circuitry and valve
control are monitored. If they exceed or fall below a set limit, an
error signal will be generated and reported via the diagnostic
LEDs on the bus coupler.
In each appropriate combination of double and single solenoid
valves, up to 32 coils can be actuated.
6

Assembly

6.1
Assembling the CL03/CL03-XL with
PROFINET
Risk of damage to the manifold
The bus coupler may be damaged if the cover is exposed to
mechanical force, such as a hard blow.
O
Make sure that the device is protected from blows.
O
Make sure that the device is well packaged during
transportation.
You will receive your individually configured CL03/CL03-XL
series valve system completely fitted with all components:
W
Bus coupler
W
Valve system
W
End plate
The operating instructions accompanying the CL03/CL03-XL VS
describe in full how to assemble the entire valve system. The VS
may be mounted in any orientation. However, mounting the VS
with the connections upwards should be avoided if possible.
Also avoid mounting the VS with the pilot valves at the lower
end.
NOTICE
59
Assembly

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Cl03Cl03-xl

Tabla de contenido