Ionisation Current Measurement - baltur TBG 45 PN-V Manual De Instrucciones

Quemadores de gas diestado con inversor
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 27
which the ignition is regular and accept this new position
as definitive. We remind you that is preferable, in the case
of the small flame, to limit the quantity of air to the least
possible needed for safe ignition, even in the most difficult
circumstances.
MANUAL BURNER OPERATION INSTRUC-
TIONS
Combustion may be checked throughout the entire modulation range
by means of manual adjustments to operation. Use the modulation
connector (B) in the figure, supplied with the burner. After discon-
necting the 4 pole socket (A) taking signals from the thermostat line
or the power regulator, insert the connector in its place (B). Use the +
button to increase the flow of gas and air or the - button to decrease.
After completing the check, plug the 4 pole plug (A) back in to restore
automatic modulation.
CONTROL EQUIPMENT AND COMMANDS FOR GAS BURNERS LME 22...
Equipment and
Safety
programmer
time
LME 22.331A2
3
LME 22.233A2
3
Preventilation
Pre-
time
ignition
30
2
30
2
0006081484_201104

IONISATION CURRENT MEASUREMENT

To measure the ionisation current, remove the jumper between
terminals 30-31 on the printed circuit with the burner off.
Connect a microammeter to the terminals (with a suitable scale
to have the burner restart). Once the flame has appeared it will
be possible to measure the ionisation current, the minimum value
of which to ensure the working of the equipment is shown in the
specific wiring diagram. After making the measurement, reset the
jumper that has been disconnected.
Time between open-
Post-ignition
ing of 1
flame valve
st
and 2
flame valve
nd
2
11
2
11
18 / 24
Air shutter open-
Air shutter clos-
ing stroke time
ing stroke time
12
12
30
30

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Tbg 60 pn-v

Tabla de contenido