Tabla De Contenido; Declaration Of Conformity - baltur TBG 45 PN-V Manual De Instrucciones

Quemadores de gas diestado con inversor
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 27
-
Before using the burner for the first time please carefully read the chapter "WARNINGS NOTES FOR THE USER : HOW TO USE
THE BURNER SAFELY" in this instruction manual, which is an integral and essential part of the product. The works on the burner
and on the esystem have to be carried out only by competent people.
-
Read carefully the instructions before starting the burner and service it.
-
The system electric feeding must be disconnected before starting working on it.
-
If the works are not carried out correctly it is possible to cause dangerous accidents.
We declare that our products
BPM...; BGN...; BT...; BTG...; BTL...; TBML...; Comist...;
GI...; GI...Mist; Minicomist...; PYR...; RiNOx...; Spark...;
Sparkgas...; TBG...;TBL...; TBML ...; TS...; IBR...; IB...
(Variant: ... LX, for low NOx emissions)
Description:
forced air burners of liquid, gaseous and mixed fuels for residential and
industrial use meet the minimum requirements of the European Directives:
2009/142/CE ..............................................(D.A.G.)
2004/108/CE ...............................................(C.E.M.)
2006/95/CE .................................................(D.B.T.)
2006/42/CE ................................................(D.M.)
and conform to European Standards:
UNI EN 676:2008 (gas and combination, gas side)
UNI EN 267:2002 (diesel and combination, diesel side)
These products are therefore marked:
0085
18/11/2010
!
Important / note
TECHNICAL SPECIFICATIONS - TECHNICAL AND FUNCTIONAL SPECIFICATIONS ....................................................................................... 4
CONSTRUCTION CHARACTERISTICS .................................................................................................................................................................. 5
GAS SUPPLY LINE ................................................................................................................................................................................................... 7
BURNER CONNECTION TO THE BOILER ............................................................................................................................................................. 8
ELECTRICAL CONNECTIONS ................................................................................................................................................................................ 9
OPERATION DESCRIPTION ................................................................................................................................................................................... 10
MODULATION OPERATION DESCRIPTION - ADJUSTING AIR ON THE COMBUSTION HEAD ...................................................................... 11
FREQUENCY CONVERTER .................................................................................................................................................................................... 13
MANUAL HEAD GAS PRESSURE ADJUSTMENT DEVICE .................................................................................................................................. 15
IGNITION AND REGULATION ................................................................................................................................................................................. 16
CONTROL EQUIPMENT AND COMMANDS FOR GAS BURNERS LME 22 - IONISATION CURRENT MEASUREMENT ................................ 18
MAINTENANCE ........................................................................................................................................................................................................ 20
PREPARATION FOR CONNECTION WITH TRAIN TURNED UPWARDS ........................................................................................................... 21
REDUCERS ASSEMBLY INSTRUCTIONS FOR LPG ............................................................................................................................................. 22
BALTUR S.p.A.
Via Ferrarese 10 - 44042 CENTO (Ferrara) ITALIA
Tel. 051.684.37.11 Fax 051.685.75.27/28
(International Tel. ++39.051.684.37.11 - Fax ++39.051.683.06.86)
http://www.baltur.it - http://www.baltur.com - E-MAIL info@baltur.it

Declaration of Conformity

i
Information
1 / 24
0006081484_201104
Dr. Riccardo Fava
Managing Director / CEO
I
Warning / Attention

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Tbg 60 pn-v

Tabla de contenido