Panel Enclosure Sealing - Mettler Toledo IND780 Manual De Instalación

Ocultar thumbs Ver también para IND780:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

Panel Enclosure Sealing

The Panel Mount enclosure must be sealed internally and externally. Follow these
steps:
1. Ensure that the appropriate approval region has been selected in setup under
Scale > Type > Approval and that the Metrology security switch S1 is in the
"on" position.
2. Install the Security Cover to prevent access to S1, the Metrology Security Switch
indicated in Figure 2-85, Main PCB Switches.
Figure 2-85: Metrology Security Switch (left) and Cover Installed (right)
3. To protect the load cell interconnecting cable/s (attached to option boards), a
security seal must be placed over the connectors to ensure that they are not
removed or disconnected. The seal also prevents access to the wire retaining
screws indicated in Figure 2-86. Figure 2-87 shows a seal in place.
Figure 2-86: Unprotected Option Board Connection
Figure 2-87: Security Seal Installed
IND780 Installation Manual
Wire retaining screws
2-49

Publicidad

Tabla de contenido
loading

Tabla de contenido