Connection To The Three-Phase Line - Sol Welding QUAD Serie Manual De Instrucciones

Ocultar thumbs Ver también para QUAD Serie:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

Instruction Manual
4. CONNECTION TO THE LINE OF USER
Before connecting the system to the net, check that the input
voltage (V) and work frequency (Hz) correspond to the values that
are printed on the machine serial number sticker and make sure
that the main switch is on the "0" position.
The electrical connection to the net can be operated trough the
equipped cable as follows:
- yellow-green cable to earth;
- Remaining 3 cables to the 3 phases.
Connect to the input cable a certified plug with the correct capaci-
ty, predispose a net socket with safety fuses or with an automatic
safety switch OFF. Make sure that the earth cable is securely con-
nected to the earth conductor (YELLOW-GREEN) of the input net
line.
NOTE:
if input cable extensions are needed, make sure to use the
correct size, which does not have to be smaller then the one that
the machine is equipped with.

4.1 CONNECTION TO THE THREE-PHASE LINE

Warning! Before the installation, it is necessary to make
sure the generator is not connected to the net.
NOTE: the generator is equipped with the three-phase feeding
cable (3 poles + ground) without plug.
If substitution is necessary proceed as follow:
NOTE: the following numbers refer to Fig. 2 to Page 10.
1. Open the door (24) unscrewing the screws (24A).
2. Connect the cable to the terminals signaled with L1, L2,
L3 and
(wire yellow-green).
Phases L1, L2, L3
L1 L2 L3
L1 L2
Earth
L1 N
(YELLOW GREEN)
3. Fix the cable (23A) with the plastic jam (23).
4. Close and fix the door (24) with the screws (24A).
L1 L2 L3
L1 L2
L1 N
QUAD AC/DC SERIES
3
ph
2
ph 400V
1
Cooler Unit
ph 230V
Cooler Unit
5
GB
GB

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Quad 275 ac/dc

Tabla de contenido