Unpacking And Inspection; Mounting The System - Mettler Toledo DCC1000e Guia De Inicio Rapido

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 65

3 Unpacking and Inspection

Inspect the shipping container. If it is damaged, contact the shipper immediately for
instructions. Do not discard the container. If there is no apparent damage, carefully
unpack the DCC1000e System. The box contains the following items:
• DCC1000e panel
• Resin pack
• Operation Manual
• Quick Start Guide
• Declaration of Conformity
If items are missing or shipping container is damaged, notify METTLER TOLEDO
immediately.

4 Mounting the System

Mounting Hole
ø 0.5" [12mm]
Sample Inlet
• Locate the system in an area to minimize sample line length and to avoid dripping or
spraying water, excess heat, dust and physical abuse.
• M ounting bolts/screws shall be minimum of 1/4 inch or 6mm diameter.
6
19.70" [500 mm]
18.50" [470 mm]
Drain
11.80" [300 mm]

Publicidad

Tabla de contenido
loading

Tabla de contenido