42
English 9.808-230.0 Rev. 01 (03/20)
1 Cable connector
2 Electric socket plug connections
3 Startup capacitor
4 Operating capacitor
Remove the cable ties.
Mark power cables.
Separate the electric connectors.
Remove capacitor.
Installation information
Observe the connection diagram.
Diagram
BD 43/35 C Ep Classic
Remove the waste water tank.
1 Cover
2 Screws
Unscrew the screws.
Remove cover.
1 Electric socket plug connections
Startup capacitor
2 Electric socket plug connections
Operating capacitor
3 Startup capacitor
4 Operating capacitor
Separate the electric connectors.
Remove capacitor.
C2
C1
C2
C1
C2
C1