eNGLISH
Initial operation
6.
INITIAL OPeRATION
6.1
Checking the parts of delivery
• Check delivery for completeness and damage caused by transport.
• Report any missing parts or damage caused by transport to your supplier immediately.
6.2
Included with the machine
Subject to modifications.
Portable tube saw
Cast aluminum clamping jaws
Durable storage and shipping case
Saw blade (Code 790 048 072)
Ring spanner (SW22)
Allen screws (M8 x 80) for mounting the machine on the work bench
Allen keys (SW5, SW6, SW8)
Brush
Tool bag
GF TOP saw blade lubricating compound
Operating instructions and spare parts list
7.
STORAGe AND TRANSPORT
ATTeNTION!
DANGeR!
WARNING!
WARNING!
46
ORBITALUM TOOLS GmbH D-78224 Singen www.orbitalum.com
Incorrect machine storage!
Diverse physical injuries and material damage.
X Store the machine in its original crate in a dry environment.
Fatal electric shock!
X Before transportation or changing the workplace, switch off the machine, wait until the
machine/tool stops running and pull the mains plug.
During transportation, the ON/OFF switch may unintentionally be activated
causing the machine to start up!
Diverse physical injuries and material damage.
X Before transportation or changing the workplace, switch off the machine, wait until the
machine/tool stops running and pull the mains plug.
Heavy weight when transporting the machine!
Danger of being injured through overstraining.
X Remove the machine with 2 persons from the case.
X Transport machines over long stretches with corresponding lifting aids.
X The machine with shipping case should be carried by 2 persons. The shipping case is
equipped with respective carrying handles.
Pc.
1
Set
1
Pc.
1
Pc.
1
Pc.
1
Pc.
4
Pc.
3
Pc.
1
Pc.
1
Tube
1
Set
1
[REV. 20200320] OC_PS_BA_790048761_00__INH-02_EN
PS 4.5 PLUS