Descargar Imprimir esta página

Milwaukee Allmand NIGHT-LITE PRO II Manual Del Operario página 21

Publicidad

Idiomas disponibles

Idiomas disponibles

To adjust for transport / storage
Hydraulic (vertical) towers
1. Set the light bar to the transport position.
A. Rotate the light bar front-to-back. See Figure
17
B. Pull the park pin and rotate 90° to lock the light
bar.
2. Set the tower arms to the transport position.
A. Loosen the adjustment nut on each tower arm.
B. Rotate each tower arm to set the light fixture
yokes to a horizontal position. See Figure 17.
C. Tighten the adjustment nuts.
3. Rotate the fixture yokes parallel to the light bar.
17
Manual (laydown) towers
1. Rotate the fixture yokes 90° (perpendicular) to the
light bar. See Figure 18
2. Turn the light fixtures to face inward toward center.
18
Raising And Lowering The Light Tower
WARNING
Crush Hazard
Raising or lowering the light tower with obstructions
or people near the light tower could result in death or
serious injury. Be sure the area is clear of people and
obstructions before raising or lowering the light tower.
Hydraulic (vertical) towers
Note: The engine does not need to be running to raise or
lower the light tower.
To raise the light tower
1. Move the tower switch (A, Figure 19) on the control
panel to the UP position to raise the tower (B) to the
preferred height.
To lower the light tower
1. Turn the tower lights off before lowering the light
tower. See Operation - Operating The Tower Lights .
2. Move the tower switch (A, Figure 19) on the control
panel to the DOWN position until the tower (B) is fully
lowered.
3. Hold the tower switch in the DOWN position for three
additional seconds, to make sure the tower is fully
lowered.
19
B
Manual (Laydown) Towers
To raise the light tower
1. Unlatch the tower locking pin (B, Figure 20).
2. Turn the winch handle (C, Figure 20) clockwise until
the light tower (A) is vertical.
3. Lock the light tower in the operating position with the
latch pin (E, Figure 20).
A
en
21
English

Publicidad

loading