Descargar Imprimir esta página

Champion Global Power Equipment 100304 Manual De Instalación página 49

Ocultar thumbs Ver también para 100304:

Publicidad

Idiomas disponibles

Idiomas disponibles

HOME STANDBY GENERATOR- ALL aXis CONTROLLER
Full flow shutoff valve
Automatic operation of the HSB system
Battery Charger and LED indicators
Exterior warning LED on the backside of the HSB
ATS operation
Exercise scheduled time of operation
Scheduled Maintenance
Fill out and provide the customer a copy of the HSB, ATS
model & serial number reference. This information is extremely
important for part purchases and service information, these
numbers are specific to each HSB and ATS.
MAINTENANCE
Before performing maintenance procedures, review SAFETY
section of your operator's manual.
Ensure that the ATS and generator ON/OFF switches (depending
on model) are in the OFF position before performing any
maintenance or cleaning.
Refer to "Resetting the maintenance hour meter" in the HSB
operator manual for instructions after performing maintenance.
MODELS
®
49
MAINTENANCE

Publicidad

loading

Este manual también es adecuado para:

100515