a
b
120
i-1
ii-1
Installation Instructions
i
Installation requirements
WARNING: THE INSTALLATION SHALL BE CARRIED
OUT ONLY BY QUALIFIED PERSONNEL AND
WITHIN THE SCOPE OF THE INSTRUCTIONS
PROVIDED IN THIS MANUAL.
Install the machine in a covered and dry area.
Fig.i-1
The installation of the machine requires a free space
of at least 3,4 x 2,8 m (134"x110").
Make sure that from the operating position the user
can see all of the machine and the surrounding area.
The operator shall forbid, in such an area, the presence
of non authorized persons and of objects which may
create possible hazards.
WARNING: THE OPERATOR IS RESPONSIBLE FOR
MACHINE OPERATION AND FOR RESTRICTING
ACCESS TO THE WORK AREA.
WARNING: ONLY THE OPERATOR MAY ACCESS
THE WORK AREA.
The machine shall be installed on a horizontal fl oor,
preferably even. Do not install the machine on a
weak or irregular fl oor.If the machine is installed on
a raised fl oor, the fl oor must have a capacity of at
least 10000 N/m² (1000kg/m² or 205 lbsxsqft).
The device does not have to be fi xed to the ground.
But we suggest that you do secure it to the ground
using appropriately sized screw anchors.
ii
Transport - Unpacking -
Handling the machine
Carriage instructions
The machine is crated in a corrugated box of appropriate
strength. Everything is then mounted on a pallet.The
machine must be moved with an appropriate lifting
device (fork lift) (a - Fig.ii-1).The machine can be
alternatively mounted on the pallet with the column
assembled. In such a case the machine must be
anchored to the transportation vehicle with a belt of
appropriate strength rolled around the column (b - Fig.
ii-1).
Operator's Manual
QUADRIGA 1000/BB
QUADRIGA 1000/BB