Descargar Imprimir esta página

Yamaha 25BMH Manual De Servicio página 126

Publicidad

CHK
CONTROL SYSTEM
ADJ
5. Adjusting the throttle cable:
• Throttle cable
Adjusting steps
(1) Set the shift lever
tion.
(2) Move the throttle
tion.
(3) Check that the magnet base stopper
is in contact with the stopper on the
engine body (full-open end stopper)
(4) If the stoppers come in contact before
the throttle is fully open, loosen the lock
6
nut
on the throttle-opening cable,
turn-in the adjusting nut
cerrect positioning is attained, and then
secure it by the lock nut
(5) If the stoppers do not come in contact
at full-open throttle, then turn-out the
adjusting nut
cable until the correct positioning is
attained, and secure it by the lock nut
6
.
3-11
1
in forward posi-
2
to full-open posi-
5
until the
6
.
5
on the throttle-opening
E
3
4
.

Publicidad

Capítulos

loading

Este manual también es adecuado para:

30hmh