Kawasaki VERSYS 1000 Manual De Servicio página 40

Ocultar thumbs Ver también para VERSYS 1000:
Tabla de contenido

Publicidad

2-18 PERIODIC MAINTENANCE
Periodic Maintenance Procedures
Engine Vacuum Synchronization Inspection
These procedures are explained on the assumption that the intake and
exhaust systems of the engine are in good condition.
Situate the motorcycle so that it is vertical.
Remove:
Fuel Tank (see Fuel Tank Removal in the Fuel System
(DFI) chapter)
Air Cleaner Housing (see Air Cleaner Housing Removal in the Fuel System
(DFI) chapter)
Fuel Hose (see Fuel Hose Replacement)
Pull off the vacuum hoses [A] from the fittings of each
throttle body.
For the US, CA, ID and SEA-B2models, pull off the rubber
caps.
Connect a vacuum gauge and hoses [A] (Special Tool: 57001-1369) to the
fittings on the throttle body.
Special Tool - Vacuum Gauge: 57001-1369
Connect a highly accurate tachometer lead [B] to one of the stick coil primary
leads.
Plug the air switching valve hose end [A] and air cleaner housing fitting [B].
NOTE

Hide quick links:

Publicidad

Tabla de contenido
loading

Tabla de contenido