Install Framing For Hood Support - arietta PRO001MX 30 Guía De Instalación, Uso Y Mantenimiento

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Install framing for hood support

warning: This installation instruction is not prepared for
horizontal discharge
If drywall is present, mark the screw hole locations.
Refer to ductwork installation guidelines.
Cut away enough drywall to expose 2 vertical studs at
the holes location indicated by the template.
Install three horizontal supports at least
between three wall studs at the bottom mounting holes
installation location.
The horizontal support must be flush with the room
side of the studs.
Use cleats behind both sides of the support to secure
to wall studs.
Reinstall drywall and refinish.
ImPORTANT
Framing must be capable of supporting  lbs.
4" X 2"
1
8-1/2" min. opening for ductwork
4"x 2" Min. Mounting Support
Side slot (4)
Top outlet
Knockouts (junction box)
Top screw location
Square slot
Rear outlet
Bottom fixing screw location

Publicidad

Capítulos

Tabla de contenido
loading

Tabla de contenido