Safety Instructions For Installation And Maintenance Work; Unauthorised Modification And Manufacture Of Spare Parts; Improper Use; Transport And Interim Storage - salmson SIL Serie Instalacion Y Puesta En Servicio

Ocultar thumbs Ver también para SIL Serie:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

2.6
Safety instructions for installation
and maintenance work
2.7
Unauthorised modification and
manufacture of spare parts
2.8

Improper use

3

Transport and interim storage

3.1

Shipping

Transport inspection
Storage
3.2
Transport for installation/
dismantling purposes
Installation and operating instructions SIL, DIL, PBS
The operator must ensure that all installation and maintenance work
is carried out by authorised and qualified personnel, who are suffi-
ciently informed from their own detailed study of the operating
instructions.
Work on the product/unit must only be carried out when at a stand-
still. It is mandatory that the procedure described in the installation
and operating instructions for shutting down the product/unit be
complied with.
Immediately on conclusion of the work, all safety and protective
devices must be put back in position and/or recommissioned.
Unauthorised modification and manufacture of spare parts will impair
the safety of the product/personnel and will make void the manufac-
turer's declarations regarding safety.
Modifications to the product are only permissible after consultation
with the manufacturer. Original spare parts and accessories author-
ised by the manufacturer ensure safety. The use of other parts will
absolve us of liability for consequential events.
The operational reliability of the supplied product is only guaranteed
for conventional use in accordance with chapter 4 of the installation
and operating instructions. The limit values must on no account fall
under or exceed those values specified in the catalogue/data sheet.
The pump is enclosed in a box or lashed to a pallet ex works and is
protected against dirt and moisture.
On arrival, inspect the pump immediately for any transport damage.
If transport damage is detected, the necessary steps involving the
carrier must be taken within the specified period.
Before installation, the pump must be kept dry, frost-free and
protected from mechanical damage.
If available, leave the covers on the pipe connections so that no dirt
and other foreign matter can get into the pump housing.
Rotate the pump shaft once a week to prevent scoring at the bearings
and sticking. Consult Salmson about which corrosion-proofing meas-
ures are to be carried out in the event of a long storage time.
CAUTION! Risk of damage due to incorrect packaging!
If the pump is transported again at a later time, it must be packaged
so that it cannot be damaged during transport.
• Use the original packaging for this, or choose equivalent
packaging.
WARNING! Risk of injury!
Improper transport can lead to personal injury.
• The pump must be transported using approved load lifting gear.
This must be secured to the pump flanges and, if necessary, to the
outer diameter of the motor (protection against slipping is
required!).
• To lift with a crane, the pump must be supported by suitable belts,
as shown. Place the belt around the pump in loops which tighten
from the pump's own weight.