Mounting Of The Boiler; Electrical Connections - Ecoflam MAX P 35 AB Manual De Instrucciones

Ocultar thumbs Ver también para MAX P 35 AB:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 29
All burners are factory tested at
single phase with neutral for auxiliary equipments
motors and 230V 50 Hz
the burner with 230V - 50Hz, modify the connections on motor and the terminal board as shown in the pic-
ture. Protect the burner supply line with suitable fuses and/or other safety devices as required by the local
regulations on the matter.
MAXIMUM LENGTHS OF SUCTION LINES FOR TWO-PIPE SYSTEM SUNTEC AS 67
Two-pipe siphon feed system
H
Two-pipe lift system
H
MOUNTING TO THE BOILER

ELECTRICAL CONNECTIONS

single phase
230V 50 Hz
13
420010334402 Max P 35 / 45 AB
(Max P 35) o 400 V 50 Hz
Should it be necessary to power
.
H
(m)
0
0,5
1
2
3
3,5
H
(m)
0
0,5
1
2
3
3,5
3-phase
(Max P 45) for
Length pipe (m)
AS 67
(m)
ø 10 mm ø 12 mm
32
90
36
90
40
90
48
90
56
90
60
90
Length pipe (m)
AS 67
(m)
ø 10 mm ø 12 mm
25
70
21
62
18
54
10
38
5
20
---
10
EN

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Max p 45 ab

Tabla de contenido