Secondary Regulations; Soft Start - Sol Welding QUAD Serie Manual De Instrucciones

Ocultar thumbs Ver también para QUAD Serie:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

Instruction Manual
12.4

SECONDARY REGULATIONS

EX. UP AND DOWN SLOPE
All the information is memorized after the last welding is done in the
JOB 0, free regulation or (continue memorization).
If they must be memorized on an specific JOB, follow the memori-
zing procedure. (See Chap. 13 JOBS SAVINGS to page 39).
The secondary regulations
are shown on the display
LCD (43) and they are
related to the JOB being
done or to a free regula-
tion.
The secondary regulations are listed below:
a) PREGAS
Pregas time
b) POSTGAS
Postgas time
c) BBT
Burning wire at the end of the weld
process
d) SOFT START
Approaching wire speed
e) T on Twin ( )
High current time measured as a % of
*
the frequency of the double puls
f) V off Twin ( )
Low current value measured as a % of
*
the high current.
g) STEP Twin ( )
Step speeding between high and low
*
current
h) TIMER (
)
Timer.
**
i) I START
Ignition current
l) UP SLOPE (
)
Up slope time from I START to I NOMINAL
***
m) DOWN SLOPE (
) Down slope time from I NOMINAL to
***
I STOP.
n) I STOP
Final current (crater filler current)
( )
Only if the double puls is on, the parameter is shown.
*
(See Par. 12.2 Adjustment of the Double Puls frequency to
page 35)
(
)
Only if the timer is on, the parameter
**
(See Par. 10.4 Selection of the job cycle and electrode
mode to page 20)
(
) Only if the slope cycle is on, the parameter
***
(See Par. 10.4 Selection of the job cycle and electrode
mode to page 20)
NOTE: if the programme is set on STD, the slope cycle is not avai-
lable.
QUAD AC/DC SERIES
GB
is shown.
is shown.
37
GB

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Quad 450 ac/dc

Tabla de contenido