Appendix A: Installation Protocol
Copy the installation protocol, fill it in and save it as a service record.
For values, note the value in the result column, otherwise a tick will suffice if the item
has been performed or considered.
NOTE!
rectified before the initial start-up and normal operation.
Unit No.
Description
Delivery checks
Missing components
Transport damage
Before installation
Foundation
Total weight
Access for maintenance
(0.7 m in front of unit)
Mounting (check availability)
Maintenance switch
Installation room, ventilation
openings
Dust collector
Duct system
Pilot-start cable (optional)
Start and control unit
Exhaust air duct directed
away from unit
Compressed air
Air lines cleaned
Air pressure
Clean and dry air
(ISO 8573-1, class 5)
Main compressed air valve
Compressed air connected
to unit
32
If a value is outside the limit or a result is incorrect or missing, this must be
Date:
Performed by:
Reference
'6.1 Delivery check'
'6.1 Delivery check'
'6.2.1 Location'
'Table 4-1: Technical data'
'6.2.1 Location'
'5.2 Connections'
'7.1.1 Indoor installation'
Duct collector manual
'5.2 Connections'
'5.2 Connections'
Start and control unit manual
'7.1 Installing VAC 12/20'
'7.1.3 Compressed air installation'
'7.1.3 Compressed air installation'
'7.1.3 Compressed air installation'
'7.1.3 Compressed air installation'
'7.1.3 Compressed air installation'
Result
Notes