Descargar Imprimir esta página

Electrical Connection; Cable Routing - Balluff BMP 01-EL1PP 1A 00-P S75 Serie Manual De Instrucciones

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 133
BMP 01- EL1PP _ 1A- _ _ _ _ -00 -P _ _ /P _ _ -S4/P _ _ -S75
Magnetic Field Positioning System
4
Installation and connection (continued)
4.4

Electrical connection

BMP 01-...-P_ _-S75
2
4
1
3
M 8-4 (Class A)
Fig. 4-14: Plug connector pin assignment (top view on pin side)
Pin Wire color
Signal
1
Brown
+24 V (operating voltage UB+)
2
White
Analog output: Voltage 0...10 V /
Current 4...20 mA
3
Blue
GND (operating voltage UB– ; refe-
rence potential)
4
Black
OUT1 (switching output S1) or C/Q
(IO-Link)
Tab. 4-1:
Plug connector pin assignment
4.5

Cable routing

Magnetic fields
Ensure that there is sufficient distance between the BMP
and holding cylinder and any strong, external magnetic
fields.
Cable routing
Do not route cables between the BMP, control system and
power supply near power lines (inductive crosstalk
possible) and ensure EMC-compliant cable routing or
machine installation.
The cable must be routed tension-free.
Bending radius for fixed cable
The bending radius for fixed cable routing must be at least
triple the cable diameter.
Cable length
Cable length max. 20 m.
Longer cables can also be used for the analog output if
external interferences remain ineffective due to the
structure, shield or routing.
www.balluff.com
BMP 01-...-P_ _-S4
2
1
3
4
M 12-4 (Class A)
english
13

Publicidad

loading