Mettler Toledo IND570 Manual De Instalación página 37

Ocultar thumbs Ver también para IND570:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 109
7. Squeeze the top of the front panel to the enclosure slightly and push upward (Figure 2-5, 2) to
2.1.2.2.
Closing the Harsh Enclosure
1. It is very important to replace the front panel of the harsh enclosure correctly and securely,
2. With the cover in place and aligned correctly, press down firmly on the front and back edges in
2-4
METTLER TOLEDO IND570 Terminal Installation Manual
unsnap the top two clips, then lift it to clear the two top clips. The cover will swing down,
hinged by two wire cables at the bottom.
1
especially for terminals installed in Division 2 areas classified as hazardous. The two clips
positioned on the sides of the enclosure help to facilitate the appropriate spacing. Before it is
pressed into place, the front panel must be centered on the enclosure, as shown in Figure 2-6.
Figure 2-6: Harsh Enclosure Front Panel Correctly Aligned
the locations shown in Figure 2-7 until four distinct clicks indicate that each of the four spring
catches is engaged.
Figure 2-7: Engaging the Four Spring Catches
2
Figure 2-5: Removing the Cover
Equal space on both
sides of front panel
30205319
|
11
|
07/2019

Hide quick links:

Publicidad

Tabla de contenido
loading

Tabla de contenido