3.5.8 CYCLE PARAMETERS. TIG PROCESS.
GAS
UPS
I2
TPR
Torch
1T ↓
Parameter
MOD
Pulse mode (2T / 4T)
TPR
Gas pre-flow time.
IS
Initial current
UPS
Ramp-up time
DWS
Ramp-down time
IE
Crater current
TPS
Gas post-flow time.
REF
Cooling mode
Cooling disconnection time (AUT Mode)
Troff2
GALA INVERMIG SYNER 230 MP Bi-PULSE
TIG PROCESS OPERATING CYCLES
MOD 2T
DWS
TPS
2T
↑
CYCLE PARAMETERS – TIG PROCESS
Parameter description
GAS
TPR
UPS
I2
IE
IS
Torch
1T ↓
2T ↑
CONFIGURABLE
VALUE
2T – 4T
0÷5.0 sec.
10 ÷ 100% I
0÷10.0 sec.
0÷10.0 sec.
10 ÷ 100% I
0÷10.0 sec.
AUT/ON/OFF
NOT ADJUSTABLE
VALUE
MOD 4T
DWS
TPS
3T ↓
4T ↑
FACTORY
VALUE
2T
0.3 (sec.)
30 (% I
2
0,4 (sec.)
0,6 (sec.)
30 (% I
2
0,4 (sec.)
---
120 sec.
63
)
2
)
2