Commissioning; Indication On Switching On; Teach-In (Tr4 Unique Coded) - SICK TR4 Instrucciones De Operación

Ocultar thumbs Ver también para TR4:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

GB
Chapter 6
6

Commissioning

WARNING
WARNING
152
© SICK AG • Industrial Safety Systems • Germany • All rights reserved
Commissioning
Commissioning requires a thorough check by qualified safety
personnel!
Before you operate a system protected by the TR4 safety switch for the
first time, make sure that the system is first checked and released by
qualified safety personnel. Please read the notes in chapter 2 "On
safety" on page 135.
Ensure the time for the safety request (renewed closing of the pro-
tective device) is greater than the risk time!
See section 9.2 "Data sheet" on page 164.
6.1

Indication on switching on

After switching on the device undertakes a self-test. During this process
the Status/Diag LED flashes
6.2

Teach-in (TR4 Unique Coded)

Prior to initially commissioning the TR4 Unique Coded, an actuator
must be taught-in. Only if there is a taught-in actuator in the response
range of the TR4 Unique Coded does the device enable its outputs.
Only the last actuator taught-in is valid.
The teach-in process can be undertaken either such that a new
actuator can be taught-in, or such that the sensor can be locked for
further teach-in processes.
Operating Instructions
Green (see Tab. 4 on page 161).
Subject to change without notice
TR4
8014465/2012-05-07

Publicidad

Tabla de contenido
loading

Tabla de contenido