Vetus STE9524D Instrucciones De Instalación página 32

Ocultar thumbs Ver también para STE9524D:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 89
4 .2
Making the opening from the inside
Hull
The location where the opening has to come
made in relation to point 'A' can now be de-
termined.
• Drill a hole as precisely as possible in the
area on the centre line of the ship where
the opening has to come.
Apply a drill with a diameter of 3 mm.
This 3 mm hole is a reference for sawing
the opening from the outside.
• Draw a centre line on the outside of the
hull.
• Look from a point in front of the boat to
the keel to draw the centre line on the
outside.
Use the hole of 3 mm as a reference.
30
020584.01
A
BOW
W
ø 3 (
L
A
vetus® Installation instructions Retractable Thrusters
1
/
")
8

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Ste5512dSte6012dSte5524d

Tabla de contenido