Scope Of Delivery; Connecting And Removing Modules; Putting Into Operation - Mettler Toledo SevenExcellence Manual De Usuario

Ocultar thumbs Ver también para SevenExcellence:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

4 Putting into Operation

4.1 Scope of delivery

Unpack the instrument and check the scope of delivery. Keep the calibration certificate in a safe place.
SevenExcellence™ is delivered with:
uPlace™ electrode arm
Measurement modules and blank modules (according to your order)
Sensors (kit version or according to your order)
Universal AC adapter
CD-ROM with Operating Instructions (all available languages)
User Manual
Declaration of conformity
Calibration certificate

4.2 Connecting and removing modules

Note
Before connecting or removing modules switch off the instrument.
METTLER TOLEDO offers different types of modules. The type of module is identified by a colored tag.
The instrument can be equipped with up to three modules. The modules can be combined in any composition
and order according to your requirements.
With less than three modules installed, protect the open sockets against moisture or contamination by installing
a blank module.
Connecting modules
1 Insert the expansion unit into the slot. The guide
rails simplify the connecting.
2 Attach the cover.
16
Putting into Operation​ ​
SevenExcellence™

Publicidad

Tabla de contenido
loading

Tabla de contenido