Preparing The Appliance For Periods Of Non-Use - Hoshizaki KM-470AJE-R452 Manual De Instrucciones

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 88
IV. Preparing the Appliance for Periods of Non-Use
• When storing the icemaker for an extended time or in sub-freezing temperatures,
follow the instructions below to prevent damage.
• To prevent damage to the water pump seal, do not leave the control switch in the
"WASH" position for extended periods when the water tank is empty.
When the icemaker is not used for two or three days under normal conditions, it is sufficient
to move the control switch to the "OFF" position. When storing the icemaker for an extended
time or in sub-freezing temperatures, follow the instructions below.
1. Remove the water from the icemaker water supply line:
1) Turn off the power supply, then remove the front panel.
2) Move the control switch to the "OFF" position.
3) Close the icemaker water supply line shut-off valve, then open the icemaker water supply
line drain valve.
4) Allow the line to drain by gravity.
5) Attach a compressed air or carbon dioxide supply to the icemaker water supply line drain
valve.
6) Move the control switch to the "ICE" position.
7) Replace the front panel in its correct position, then turn on the power supply.
8) Blow the icemaker water supply line out using the compressed air or carbon dioxide supply.
9) Close the icemaker water supply line drain valve.
2. Drain the water tank:
1) Turn off the power supply, then remove the front panel. Move the control switch to the
"OFF" position.
2) Remove the insulation panel.
3) Slide the cube guide to the right, then remove the rubber hose and overflow cap covering
the overflow pipe. See Fig. 16. Unscrew the overflow pipe. After the water tank has drained,
reconnect the overflow pipe. Replace the rubber hose, overflow cap, and cube guide in
their correct positions. NOTICE! Make sure the O-ring is attached to the bottom of the
overflow pipe and be careful not to cross thread the overflow pipe.
4) Replace the insulation panel in its correct position.
5) Remove all ice from the storage bin. Clean the storage bin using a neutral cleaner. Rinse
thoroughly after cleaning.
6) Replace the front panel in its correct position.
CAUTION
20
ENGLISH

Publicidad

Tabla de contenido
loading

Tabla de contenido