Mounting - Fronius Acctiva Seller Manual De Instrucciones

Ocultar thumbs Ver también para Acctiva Seller:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 63

Mounting

NOTE!
Danger due to improper installation of the charger in a switch cabinet (or in a si-
milar enclosed space).
This can result in damage to property.
The space requirement dimensions in mm (inches) illustrated below are given to
ensure that there is easy access to the plug connections:
Space requirements with edge protector
Space requirements without edge protector, and space requirements with signal lamp and bracket
options (* space for mounting/removal)
54
Ensure sufficient heat dissipation using forced-air ventilation.
There should be a clearance of 10 cm (3.94 in.) all around the device.
247 (9.72)
233 (9.17)
6,5
(.26)
270
(10.63)
100
(3.94)
15,5
(.61)
88 (3.46)
126 (4.96)

Publicidad

Tabla de contenido
loading

Tabla de contenido