Blodgett SG3240 Serie Manual Del Operario página 17

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 259
6. Install the inner master links to connect the
two ends of the conveyor belt. See Figure 12.
Proper
Position
Upside-down
Inner Master Link
Figure 12
Installation
7. Install the outer master links to finish connect-
ing the two ends of the conveyor belt. See
Figure 13.
NOTE: The extra piece of wire belt can be used to
make additional master links if the original
links are lost or damaged.
15
Oven Assembly
Outer Master Link
Figure 13

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Sg3240g/aaSg3240e/aa

Tabla de contenido