WARNING!!
Always disconnect the power supply be-
fore cleaning or servicing the oven.
WARNING!!
If gas ovens need to be moved, the gas
must be turned off and disconnected from
the unit before removing the restraint. Re-
connect the restraint after the oven has
been returned to its original location.
Follow this recommended cleaning schedule for
proper oven performance.
DAILY:
1. Clean the conveyor belt using a wire brush.
Allow any foreign material to drop into the
crumb pans.
2. Empty and clean the crumb pans.
3. Make sure cooling fans are operating. Ex-
haust air should be blowing out from both:
the louvers on the right side toward the rear
D
the perforated holes on the bottom of the
D
unit, under the emergency stop button.
EVERY THREE MONTHS:
1. Brush then clean the louvers on both ends of
the oven with a clean damp cloth.
EVERY SIX MONTHS:
1. Unplug the oven. Disconnect the gas connec-
tions.
2. Remove the crumb pans and product stop
from the ends of the conveyor. See page 17.
3. Open and lower or remove the front access
door.
4. Pull the air plate out of the oven cavity using
the air plate hook provided with the oven.
5. Pull each nozzle out of the oven cavity.
6. Remove the nozzle support bar.
Maintenance
7. Clean the conveyor assembly as follows:
NOTE: The conveyor and cooking chamber
may be cleaned while the conveyor is
installed. However, we recommend re-
moving the conveyor for thorough
cleaning.
8. Remove the conveyor locating pin that se-
cures the conveyor assembly to the conveyor
bracket. The pin has a pull ring located under
the drive chain, behind the electrical box ac-
cess door.
9. Push the conveyor assembly in to loosen the
drive chain. Remove the drive chain from the
conveyor sprocket. If unable to push the as-
sembly, loosen motor mounts.
10. Standard conveyor assemblies:
The standard conveyor can be removed and
cleaned in one piece with the belt on.
--- Slide the conveyor assembly out from the
drive side of the oven.
If space is limited, the conveyor can be
disassembled and removed as follows:
--- Use needle-nose pliers to remove the
conveyor belt master links. See page 15.
--- Slide the belt out from one end. Be sure to
roll the belt as shown in Figure 23.
Otherwise the belt will be upside down
when rethreading.
--- Slide the right conveyor rack out of the
oven.
--- Slide the left conveyor rack out from the
drive side of the oven.
Folding conveyor assemblies:
--- Slide the folding conveyor assembly out
from the drive side of the oven. Fold the
sections over as they come out of the
cooking chamber.
11. Remove the conveyor support angles. Twist to
slide them off of the mounting pins. See page
11.
31
Cleaning