I
Rail Assembly
for CHAIN DRIVE OPENER
Jocat® Bag O t_-o£ Box_ 1
3. Remove
the two rail sections
that are not
connected
to the chain and place them on
floor
(Fig. 1-2, A).
4. Carefully
remove
the third
rail section
with
chain and plastic
sleeve.
Place rail section
on
floor
and extend chain
straight
out
(Fig. 1-2, B). Chain and rail should extend
approximately
7 feet.
5. Remove wire ties and plastic bag from chain.
Leave chain extended
straight out on floor.
Avoid kinks in the chain by careful handling and
keeping chain flat on the floor.
6. Align
the three rail sections
by pulling
the
chain straight
and wrapping
it around
the
chain tensioner
pulley
(Fig. 1-3 & 1-4).
7. Attach the two rail clamps to the rail section
joints with (4) bolts and nuts. After both rail
clamps have been assembled
to the rail sections,
securely tighten the bolts and nuts.
CHAIN DRIVE RAILS
BELT DRIVE RAILS
Belt Rail
Rail Assembly
for BELT DRIVE OPENER
Jocat® Bag 0 _<:}n Box_ f
3. Remove
the two rail sections
that are not
connected
to the belt and place them on floor
(Fig. 1-2, A).
4. Carefully
remove the third rail section with
belt. Place rail section on floor, remove ties on
belt and extend belt straight out (Fig. 1-2, B).
Avoid twists and kinks in the belt by careful
handling and keeping belt flat on the floor. Belt
and rail should extend approximately
7 feet.
5. Align
the three rail sections
by pulling
the belt
straight
and wrapping
it around
the tensioner
pulley
(Fig. 1-3 & 1-4).
6. Attach the two rail clamps to the rail section
joints with (4) bolts and nuts. After both rail
clamps have been assembled
to the rail sections,
securely tighten the bolts and nuts.
FIG. 1-2
Split Rail sections.
CHAIN
Rall Clam )s
Rail with
chain
Rail Clamp
Bolts
Cha
Power Head
Trolley Slide
Rail
Clam
Nut!
Center
Ra
Release
Rnol)
Rail with belt
FIG. 1-3
Split Rail assembly.
Wrap around tensioner
pully
FIG. 1-4
Mount chain/belt to tensioner pulley.
0
PN# 36420Supplement,
10/27/2008