P P o o w w e e r r t t y y p p e e
O O p p e e r r a a t t i i o o n n a a l l
v v o o l l t t a a g g e e r r a a n n g g e e
AC
100 to 240 VAC
DC
12.5 to 16 VDC
I I n n s s t t a a l l l l i i n n g g t t h h e e S S M M R R T T c c h h a a r r g g e e r r
When installing the S S M M R R T T charger, place the S S M M R R T T charger in an environmentally controlled location that is:
•
Free of excessive dust and moisture
•
Kept within a constant temperature range. An allowable temperature range is 43 °F to 88 °F (6 °C to 31 °C). The optimal
temperature range is 65 °F to 75 °F (18 °C to 24 °C).
•
Readily accessed for use
Locate and maintain the power supply and power cords to minimize the risk of damage and inadvertent disconnections.
I I n n s s t t a a l l l l i i n n g g t t h h e e o o p p t t i i o o n n a a l l m m o o u u n n t t i i n n g g b b r r a a c c k k e e t t
W W A A R R N N I I N N G G
• Always have a certified mechanic, familiar with ambulance vehicle construction, install the optional mounting bracket
and the S S M M R R T T charger.
• Always mount the S S M M R R T T charger to the optional mounting bracket in an enclosed cabinet and out of patient reach
during transport to comply with established crash test standards.
• Always make sure that the optional mounting bracket is securely attached to the surface.
To install the optional mounting bracket (Figure 28):
1. Use the S S M M R R T T charger mounting bracket as a template to mark the location of the mounting holes (A) at the area where
you will install the mounting bracket.
2. Position the mounting bracket, making sure that the:
a. Spring tab (B) is located at the rear of the S S M M R R T T charger.
N N o o t t e e - - When mounting the bracket to a vertical surface, the spring tab should be horizontal with the spring tab point
to the left (Figure 28).
b. Power cord easily plugs into the rear of the S S M M R R T T charger.
c. S S M M R R T T charger slides from front to back to connect to the bracket after mounting.
d. Bracket is installed correctly for the ambulance or station location:
A A m m b b u u l l a a n n c c e e l l o o c c a a t t i i o o n n
•
Secure the bracket to a horizontal structural support
surface or shelf using size #10, grade 5 screws
minimum (not supplied).
•
Make sure that the selected mounting surface is strong
enough to securely hold the S S M M R R T T charger and S S M M R R T T
Pak during transport.
•
Locate the bracket in an enclosed cabinet and out of
patient reach during transport.
•
Allow for easy S S M M R R T T Pak installation and removal.
•
Locate the power supply within reach of the power cord.
6516-209-005 Rev E.0
F F r r e e q q u u e e n n c c y y
M M a a x x i i m m u u m m
c c u u r r r r e e n n t t d d r r a a w w
50/60 Hz
1.20 A
N/A
4.16 A
S S t t a a t t i i o o n n l l o o c c a a t t i i o o n n
•
•
•
•
S S t t a a n n d d b b y y c c u u r r r r e e n n t t
d d r r a a w w
0.05 A
0.20 A
Secure the bracket to a horizontal or vertical structural
support surface using size #10, grade 5 screws
minimum (not supplied).
For vertical installation, position the mounting bracket
so the spring tab is directly below the mounting screws,
so the S S M M R R T T Pak remains supported by the S S M M R R T T
charger even if the release button is accidently pressed.
Allow for easy S S M M R R T T Pak installation and removal.
Locate the power supply within reach of the power cord.
L L o o w w v v o o l l t t a a g g e e
s s h h u u t t o o f f f f
N/A
10 VDC
43
EN