Descargar Imprimir esta página

Pit Boss PRO Serie Montaje Y Operación página 11

Ocultar thumbs Ver también para PRO Serie:

Publicidad

Idiomas disponibles

Idiomas disponibles

12. PLACING THE ASH BOX
Parts Required:
1
x
Ash Box (#11)
Installation:
Insert the Ash Clean-out Box into the Ash Clean-out Housing on the
front panel of the unit, below the Front Shelf. Tighten the bottom
screw counterclockwise to lock into place.
NOTE: The Ash Box is completely inserted once the front of the tray
is pushed in as far as it can go, with no gap between the Ash Box and
the front panels.
13. PLACING THE GREASE CUP
Parts Required:
1
x
Grease Cup (#25)
Installation:
Slide the grease cup into the grease tray brackets on the back underside
of the main cabinet.
NOTE: The grease tray is completely inserted once the front of the
tray is pushed in as far as it can go.
14. MOUNTING THE SIDE SHELF BRACKET
Parts Required:
1
x
Left Side Shelf Bracket (#20)
1
x
Right Side Shelf Bracket (#21)
Screw ( #B)
6
x
Installation:
Hand-tighten a Side Shelf Bracket with three screws to the right-
facing side of the Main Barrel.
Repeat for the other Side Shelf Bracket.
NOTE: Do not tighten screws completely until all screws have been
installed. Once all screws are installed, then tighten securely.
12
11
13
14
20
B
25
21
B
11

Publicidad

loading

Este manual también es adecuado para:

Pbv6pse513953211007