Descargar Imprimir esta página

Pit Boss PRO Serie Montaje Y Operación página 9

Ocultar thumbs Ver también para PRO Serie:

Publicidad

Idiomas disponibles

Idiomas disponibles

5. SECURING THE SUPPORT BAR
Parts Required:
1
x
Support Bar (#27)
2
x
Screw (#C)
Locking Washer ( #I)
2
x
Washer (#J)
2
x
Installation:
Install the support bar to the rear of the unit between the two rear
support legs. Secure using screws, locking washer, and washer on each
side. Ensure the support bar is placed on the underside of the main
cabinet, facing inwards. Note illustration for support bar arrangement.
6. MOUNTING THE POWER CORD BRACKET
Parts Required:
Power Cord Bracket (#24)
1
x
Screw ( #C)
2
x
Installation:
Locate the two holes on the bottom of the right support leg. Mount
the power cord bracket to the support leg using two screws as shown
in the illustration.
7. SECURING THE ASH AND GREASE TRAY BRACKETS
Parts Required:
Grease Tray Brackets (#26)
2
x
Ash Tray Bracket (#9)
1
x
8
x
Screw ( #C)
2
x
Screw (#D)
Installation:
Secure the grease tray brackets onto the base of the cabinet using two
screws in each bracket. Note illustration for proper placement.
Align the Ash Tray Bracket on the front of the unit. Secure it to the
cabinet with four screws. Use the flat machine screws to attach the
bracket to the front panels. Next, carefully turn the unit into an
upright position.
5
I X2
27
J X2
6
24
C
C
7A
C
C
26
C
C
7B
C
C
9
D
D
C
C
9

Publicidad

loading

Este manual también es adecuado para:

Pbv6pse513953211007