TESTING OF THE APPLIANCE
Important
Before it is put into service, the system
must be tested to check the operating con-
ditions of every single component and
identify any malfunctions. In this stage, it is
important to check that all health and safety
requirements have been complied with in
full.
To test the system, make the following checks.
1 - Turn on the gas supply tap and check that the
connections are right.
2 - Check that the mains gas is the same as that
used for commissioning of the appliance, and
carry out the conversion procedure if necessary
(see page 16).
RECOMMENDATIONS FOR ADJUSTMENTS
Important
Before making any type of adjustment, acti-
vate all the safety devices provided and de-
cide whether staff at work and those in the
vicinity should be informed. In particular,
turn off the gas supply tap and prevent ac-
ADJUSTING GAS VALVE SETTING
Important
This adjustment is only required if the type
of gas to be connected is different from that
used for testing after the conversion proce-
dure has been carried out (see page 16). Be-
fore making this adjustment, check that the
gas supply pressure is the same as the rat-
ed pressure for the type of gas in use (see
table at back of manual).
After testing, if necessary instruct the user in all the
skills necessary for putting the appliance into oper-
ation in conditions of safety, in accordance with le-
gal requirements.
ADJUSTMENTS
cess to all devices which might cause un-
expected health and safety hazards if
turned on.
Natural gas
In this case the gas pressure upstream of the noz-
zle has to be adjusted.
Proceed as follows.
- 17 -
3 - Check that the burner is switching on correctly
and its combustion.
4 - Check the gas pressure and flow-rate at mini-
mum and maximum settings and adjust if nec-
essary (see pages 17).
5 - Check that the safety thermocouple is working
correctly.
6 - Check that there are no gas leaks.
7 - Check that the nameplates specify the correct
gas for the country of use.
1 - Fill the well with water (about 10 litres).
2 - Turn off the gas supply tap.
3 - Pull off knob (A) and disassemble handle (B).
4 - Remove the knob units (L).
5 - Undo the screws (C) and remove the panel (D).
6 - Undo the screw (E) of the pressure connection
(output pressure).