AQUA SALT
Salt chlorine generator
To properly install the chlorine generator in your system, we recommend to create a deviation on
3.3
which to place the electrolytic cell, as indicated in the diagram below. However, installing the
generator on the main pipeline does not affect the its correct functioning. See paragraph 3.1.1 for
Hydraulic connections
further information.
3.4
Electrical connections
ADSP7000648
Cut the power supply during installation.
Check that the voltage indicated on the unit (180..260 VAC @ 50/60 Hz) corresponds to
the voltage available at the installation place before connecting the devices.
If the supply cable is damaged, please contact the manufacturer, the local representative
or other qualified personnel to replace it and prevent any danger.
Electrical connections must be done exclusively by authorized and qualified personnel, in
compliance with the regulations of the Country of installation See the picture below for an
example of electrical connections.
It is possible to supply the control box by connecting it to the electrical system with the
supplied cable. It is also possible to connect it to an external timer, to another control box
or to a main switch (see letter E, picture 5). Moreover, you will be able to make the
chlorine generator work depending on the activation of the circulation pump by connecting
the device as indicated in picture 5, letters B and D. For any other connection, please
contact your sales representative.
10 Example of connections Hydraulics and Electrical
A
Bipolar switches
B
Contactor to activate the circulation pump
C
Control relay of the contactor
D
Circulation pump operating feedback
E
External auxiliary activation
rev. 1.4
MAINTENANCE AND INSTRUCTION MANUAL
Description
31/07/2017
ENGLISH
69
69/264