Installing The High Temperature Design - ABB FSM4000 Instrucciónes De Puesta En Marcha

Caudalímetro electromagnético
Ocultar thumbs Ver también para FSM4000:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 135
Electrical connection
Fig. 24
1 Packaging bag
2 Drying bag
3 Clamp
4.2.3

Installing the high temperature design

When installing the high temperature design with a fluid temperature of max. 180 °C, the
connection box for sizes DN 125 [5"] and larger is separated from the lower section of the
flowmeter sensor by a piece of pipe. This provides complete thermal insulation between the
flowmeter sensor and connection box. The pipeline and flowmeter sensor insulation must be
performed after installation according to the following illustration.
Fig. 25
1 Insulation
22 - EN
4 Sealing compound
5 Filling height
1
FSM4000
G00557
D184B141U03

Publicidad

Tabla de contenido
loading

Tabla de contenido