Starting And Using The Machine - Dalla Corte EVO2 Manual De Usuario

Ocultar thumbs Ver también para EVO2:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

Starting and use of the machine
Follow the instructions below with
the help of the scheme in Pic.1.
• Turn on the water supply tap
( 1 Pic.1).
• Turn on the ON/OFF electric
supply switch ( 7 Pic.1) and turn
the machine switch clockwise
( 1 Pic.2); make sure the display
turns on.
• As soon as the machine has
been turned on, the automatic
auto-fill function starts filling
the boiler until the right level is
reached; during this stage, the
symbol blinks on the display.
• Once the filling phase is over,
groups start heating up and the
pre-set values in group tempera-
ture boxes start blinking.
50
• At the end of the heating pha-
se, values in group temperature
boxes stop blinking.
• Immediately afterwards, the
boiler heating phase starts, du-
ring which the value in the boiler
temperature box blinks.
• During boiler heating up,
groups can already be used.
• As soon as boiler reaches its
set temperature, the set value in
the boiler temperature box stops
blinking and the machine bleeps
twice to inform the whole machi-
ne is ready for use.

Hide quick links:

Publicidad

Tabla de contenido
loading

Tabla de contenido