Descargar Imprimir esta página

Nussbaum SMART LIFT 2.30 SL Manual Del Usuario página 115

Ocultar thumbs Ver también para SMART LIFT 2.30 SL:

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

7.1 Maintenance plan
i
Before beginning service, disconnect from power. The work area around the lift is to be secured against unautho-
rized use.
Visual
inspection
Spray
Time frame
Type of
maintenance
12
1
11
2
10
365 x / 12
9
3
4
8
5
7
6
12
1
11
2
10
1 x / 12
9
3
4
8
5
7
6
OPI_SMART LIFT 2.30 SL-2.35 SL-2.40 SL_V4.4_DE-EN-FR-ES-IT
Oil
Lubricate
B
P
C
F
D
E
N
M
O
K
J
Model and information signs, labels, brief operating instructions,
safety stickers and warning information are to be cleaned and
exchanged if damaged.
Lubricate the lubrication nipple at the upper end of the lift spindle
bearing with a multi-purpose grease. For this, the spindle cover (g)
must be removed in advance and pulled out upwards.
Do not over-lubricate.
Clean with
compressed
air
A
1
2
4
3
G
H
Q
Maintenance plan
Clean
Inspect
Pos.
Model
and
infor-
mation
signs
A
115

Publicidad

loading

Este manual también es adecuado para:

Smart lift 2.35 slSmart lift 2.40 sl