Descargar Imprimir esta página

Nussbaum SMART LIFT 2.30 SL Manual Del Usuario página 118

Ocultar thumbs Ver también para SMART LIFT 2.30 SL:

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

Made
in
Germany
Time frame
Type of
maintenance
12
1
11
2
10
1 x / 12
9
3
4
8
5
7
6
12
11
1
2
10
1 x / 12
9
3
4
8
5
7
6
12
11
1
2
10
1 x / 12
9
3
4
8
5
7
6
118
Maintenance plan
Spindle centring (run-on delay)
Torque: Approx. 4 Nm
Gap: Approx.1 mm
Rear side: The half shells are attached.
Check the condition and function of spindle centring (run-on delay)
, tighten if required. Ensure that the interior side of the half shells
contact the spindle. If required, rework the cut edges of the half shells
with a file (do not saw!)
If spindle centring can no longer be adjusted, exchange the half
shells.
The fastening screws of the hose clamps are located at the height of
the gap.
Half shells if required,
can only be filed and not
sawn!
Check spindle centring.
Manually set (without torque wrench)
Place one hand on the spindle and turn it slightly back and forth.
During this with a T-wrench, turn the hose clamp until the back and
forth of the spindle is only possible with high force.
Once is the case, place the second hand on the spindle.
When the spindle can be moved well but is taut with both hands,
then spindle centring is properly set.
Before starting other work, do the same procedure on the second
column.
Once it has been determined that at no point in time is a higher
effort required to turn the spindle by hand, then the cut surfaces of
the spindle centring must be reworked or the half shells exchanged.
Check the lifting arm block and gear for wear. Exchange both com-
ponents if there is visible damage.
Check the DU bearing of the spindle guide for wear. Slightly oil with
a runny oil similar to SAE 15W40.
Set 4 Nm
OPI_SMART LIFT 2.30 SL-2.35 SL-2.40 SL_V4.4_DE-EN-FR-ES-IT
Pos.
1 mm
F
G
H

Publicidad

loading

Este manual también es adecuado para:

Smart lift 2.35 slSmart lift 2.40 sl